Cobblestone retaining wall construction in Colorado

Stone retaining wall construction tricks: If the block Retaining wall is more substantial as in a metre high or more then the fence would have to be behind the wall instead of through or on top. Most Segmental Retaining Wall blocks do not have a big enough cavity or void for the fence post to be directly concreted inside them and would lack the strength to hold the weight of a fence. Generally, most walls are built using an aggregate (Gravel) backfill or in some circumstances No Fines Concrete (NFC). Because of this, an allowance has to be made for the fence post at the early construction stage such as installing PVC Piping as a sleave for the fence post to fit into, this would require some forethought and good planning.

Get the first course right. Use a torpedo level to level each block front to back and either a 4-foot or 6-foot level to keep each course level and even. Set the blocks with a heavy rubber or plastic mallet. Getting the first course flat and level is extremely important, so take your time. Try to lay the course as close to the center of the trench as possible. Even a small pebble on the surface of a block will throw the one above it out of alignment. And that crooked block will affect the one above it, and so on. That little stone could eventually create an unattractive hump in the top course.

A wall that leans into the soil it retains is less likely to be pushed outward by soil pressure than a plain-old vertical wall. Design and build your retaining wall to slope at a minimum rate of one inch for every one-foot of rise (height). Fortunately, working with retaining wall blocks makes it incredibly easy to achieve this “step-back” construction! The locking flange on the bottom edge of every block guides it to click into position slightly behind the lower block, preventing the top blocks from being pushed outward.

Good drainage is essential for any retaining wall. Drainage is provided by filling coarse gravel behind the wall and by building weep holes into the wall. Make weep holes by inserting short lengths of 2-inch plastic pipe or 3-inch drain tile in the forms when they are built. The first row should be 2 inches to 4 inches above ground level. If the wall is higher than 4 feet, place a second row of weep holes 3 inches above the first. Read more info on Best Retaining Walls Colorado.

We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. We serve all of Colorado out of our home office in Colorado Springs. Please feel free to reach out to us with any questions you may have. Estimates are always free and everything we touch comes with a warranty.